01. »STANDARD«
- New switch gear
- New operating desk with touch panel
- New PLC
- New drives
- New sensor technology
- A/C drives (optional)
- Modem for remote maintenance
02. 'PNEUMATICS'
- New valves
- New I/P Converters
- New switching elements (valve terminal, pop-off valve, etc.)
03. "EDGE CONTROL"
- New scanning head
- New Amplifiers
- New actuators (optional)
04. »HYDRAULIK«
- New valves
- New hydraulic power pack unit (optional)
05. "SERVICE PACKAGE"
- Service agreement
- Hotline with online service
- Online diagnostics and service via modem
- Spare parts service within 24 hours (depending on country/infrastructure)
- Short-term availability of qualified technicians and engineers
06. "CE PACKAGE"
As part of the CE marking for redesigned slitter rewinders, the following services are provided:
- Carrying out the risk assessment for CE marking in accordance with the Machinery Directive 2006/42/EC and DIN EN ISO 12100
- Preparation of the German-language operating instructions in accordance with the Machinery Directive 2006/42/EC and DIN EN 82709
- Verification and validation plan of the safety-relevant parts of the control system in accordance with the Machinery Directive 2006/42/EC and DIN EN ISO 13849-1 and -2 using the BG software SISTEMA
CONTACT US BELOW TO LEARN ABOUT THE BENEFITS OF A SERVICE CONTRACT